Engineering services for a hydropower plant and transmission line Malagarasi HPP will be a run-of-the river hydropower plant (IP = 49 MW) located on Malagarasi River in Tanzania. The project will result in an additional supply of power to the grid, that will support the economic activities in the Kigoma region, guaranteeing availability of reliable electricity supply. Studio Pietrangeli is very proud of assisting TANESCO providing all the engineering services for the preparation and implementation of the construction of the project, contributing to the increase in the renewable sources of energy in Tanzania. The layout of the project includes an overflow gravity weir, about 600 m long that diverts the flows into the waterway. The waterway system includes a culvert, about 1 km, that leads the discharges to the short penstocks, through an outdoor surge shaft, and then to the outdoor powerhouse located on the right river bank. A 132kV transmission line will transfer the power to the grid towards Kigoma substation. Studio Pietrangeli has been continuously present in Tanzania since 1989 successfully completing several engineering projects in the water sector. Thanks also to its internationally renowned projects in Ethiopia, Zambia and Zimbabwe SP is currently a leading engineering firm in the region for hydropower, transmission line, irrigation and water supply projects. PLACE CLIENT YEAR Tanzania
Malagarasi Hydropower
Tanzania
Malagarasi Hydropower
Kigoma region - Tanzania
Tanzania Electric Supply Company (TANESCO)
2018 – 2019
Main Features
Tanzania
Malagarasi Hydropower
Engineering
ServicesReview of Previous Feasibility Design
Basic Design
Tender Documents