Montedoglio Dam

Engineering services for the restoring of earthfill dam

Jamaica

Montedoglio Dam

Montedoglio dam has suffered some damages at the spillway and dam body due to a large flood occurred in 2010. Studio Pietrangeli has been appointed to carry out the assessment of the current conditions and the design of the refurbishment works to restore the complete functionality of the structures damaged during the events of year 2010.

.

Italy

PLACE

IMPREPAR S.p.A. (Impregilo Group)

CLIENT

2013 - 2015

YEAR

Main Features

  • Reservoir ( Total storage 168 Mm3 )
  • Main Dam ( Earthfill type, H = 64.30 m, Crest length 566 m, Crest elevation 398.30 m s.l.m., Embankment volume 2.7 Mm3 )
  • Secondary Dam ( Earthfill type, H = 8.6 m, Crest length 288 m, Crest elevation 398.30 m s.l.m., Embankment volume 40,000 m3 )
  • Intake ( Rectangular type (WxH) 4.2×6.0 mxm )
  • Spillway ( design discharge Q = 909 m3/s, side spillway ungated L = 112 m + n° 2 gates L = 24 m )
  • Bottom outlet ( design discharge Q = 339 m3/s, L = 423 m, D = 6 m )

Italy

Montedoglio Dam

Engineering
Services

Assessment of the damages occurred after the flood event (spillway, dam embankment)

Assessment of the conditions of the dam

Survey, site and laboratory investigations

Feasibility and final design of the rehabilitation works for the damaged structures

Supervision of construction of the rehabilitation works