Kabuyanda Multi-Purpose Project

Engineering for hydropower plant, water supply and irrigation

Uganda

Kabuyanda Multi-Purpose Project

Kabuyanda is a multipurpose dam envisaged for agriculture (paddy rice and likely to include maize, pulses and vegetables for local markets), as well as water supply for municipality and for the livestock.

Uganda

PLACE

Nile basin initiative Nile Equatorial Lakes Subsidiary Action Program (NELSAP)

CLIENT

2015 – in progress

YEAR

Main Features

  • Power House ( Open air Type; Max. Turbine Flow=254 m3/s, Gross Head= 230 m, IP = 494 MW; Energy Production 2140 GWh/y )
  • Embankment Dam ( Catchment Area = 109 km2, H = 23 m , L = 350 m, V = 10 Mm3 )
  • Powerhouse ( IP = 0.2 MW, Francis Turbine )
  • Irrigation Scheme ( A = 4203 ha )
  • Water supply ( 70’000 population )

Uganda

Kabuyanda Multi-Purpose Project

Engineering
Services

Feasibility Study

Detail Design

Tender Documents