Flood management for several existing reservoirs The assignment consists in the analysis of current conditions, dam break studies and relative emergency preparedness plan for five existing reservoirs in the island of Mauritius. The dam break analysis and related emergency preparedness plan, is an important means for the safety of the population living on potentially flooded areas downstream of the dams. Studio Pietrangeli is proud of being an active firm involved in this topic with the goal to protect Muaritius’s inhabitants, fauna and flora, along with the water supply resources for irrigation and drinking purposes of the island. Two reservoirs are in the District of Plaines Whilems, Mare aux Vacoas and Mare Longue reservoir. On the west side of the island, in the District of Black River it is located the La Ferme reservoir. The remaining two reservoirs, Midlands and Piton du Milieu, are located in the District of Moka, in the center of the island. PLACE CLIENT YEAR LA FERME RESERVOIR MIDLANDS RESERVOIR MARE LONGUE RESERVOIR PITON DU MILIEU RESERVOIR Mauritius
Dams Break Studies
Mauritius
Dams Break
StudiesMauritius
Government of Mauritius, Ministry of Energy and Public Utilities
2018 – 2023
Main Features
MARE AUX VACOAS RESERVOIR
• Reservoir ( water supply, V = 19.5 Mm3 )
• Cogliano Dam ( Earthfill, H = 10 m, L = 1214 m )
• Tamarin Dam ( Earthfill, H = 11 m, L = 671 m )
• Mare Soulier Spillway Dam ( Masonry, ungated, H = 6 m, L = 706 m )
• Second Spillway Dam ( Masonry, ungated, H = 3.5 m, L = 358 m )
• Reservoir ( irrigation, V = 11.9 Mm3 )
• Earthfill Dam ( H = 3 ÷ 9 m, L = 1250 m )
• Masonry Dam ( H = 12 m, L = 276 m )
• Spillway ( Ungated masonry with concrete hearting with crest wall, L = 145 m )
• Reservoir ( water supply and irrigation, V = 25.5 Mm3 )
• Rockfill Dam with upstream asphalt face ( H = 20.5 m, L = 2449 m )
• Spillway ( Ungated, H = 30 m, L = 63 m )
• Reservoir ( multipurpose, V = 7 Mm3 )
• Earthfill Dam ( H = 13 m, L = 768 m )
• Spillway ( Ungated concrete conical chute, L = 153 m )
• Reservoir ( water supply, V = 3.0 Mm3 )
• Earthfill Dam ( H = 13.5 m, L = 836 m )
• Spillway ( Ungated concrete crest wall, L = 275 m )
• Secondary spillway ( Ungated concrete crest wall, L = 89 m ) Mauritius
Dams Break Studies
Engineering
ServicesReview of previous studies and recommendations for dam refurbishment
Dam Break studies
Emergency Preparedness Plan