Skip links

Mauritius

Dams Break Studies

Flood management for several existing reservoirs

Mauritius

Dams Break
Studies

The assignment consists in the analysis of current conditions, dam break studies and relative emergency preparedness plan for five existing reservoirs in the island of Mauritius.

The dam break analysis and related emergency preparedness plan, is an important means for the safety of the population living on potentially flooded areas downstream of the dams. Studio Pietrangeli is proud of being an active firm involved in this topic with the goal to protect Muaritius’s inhabitants, fauna and flora, along with the water supply resources for irrigation and drinking purposes of the island.

Two reservoirs are in the District of Plaines Whilems, Mare aux Vacoas and Mare Longue reservoir. On the west side of the island, in the District of Black River it is located the La Ferme reservoir. The remaining two reservoirs, Midlands and Piton du Milieu, are located in the District of Moka, in the center of the island.

Mauritius

PLACE

Government of Mauritius, Ministry of Energy and Public Utilities

CLIENT

2018 – 2023

YEAR

Main Features

MARE AUX VACOAS RESERVOIR
• Reservoir ( water supply, V = 19.5 Mm3 )
• Cogliano Dam ( Earthfill, H = 10 m, L = 1214 m )
• Tamarin Dam ( Earthfill, H = 11 m, L = 671 m )
• Mare Soulier Spillway Dam ( Masonry, ungated, H = 6 m, L = 706 m )
• Second Spillway Dam ( Masonry, ungated, H = 3.5 m, L = 358 m )

LA FERME RESERVOIR
• Reservoir ( irrigation, V = 11.9 Mm3 )
• Earthfill Dam ( H = 3 ÷ 9 m, L = 1250 m )
• Masonry Dam ( H = 12 m, L = 276 m )
• Spillway ( Ungated masonry with concrete hearting with crest wall, L = 145 m )

MIDLANDS RESERVOIR
• Reservoir ( water supply and irrigation, V = 25.5 Mm3 )
• Rockfill Dam with upstream asphalt face ( H = 20.5 m, L = 2449 m )
• Spillway ( Ungated, H = 30 m, L = 63 m )

MARE LONGUE RESERVOIR
• Reservoir ( multipurpose, V = 7 Mm3 )
• Earthfill Dam ( H = 13 m, L = 768 m )
• Spillway ( Ungated concrete conical chute, L = 153 m )

PITON DU MILIEU RESERVOIR
• Reservoir ( water supply, V = 3.0 Mm3 )
• Earthfill Dam ( H = 13.5 m, L = 836 m )
• Spillway ( Ungated concrete crest wall, L = 275 m )
• Secondary spillway ( Ungated concrete crest wall, L = 89 m )

Mauritius

Dams Break Studies

Engineering
Services

Review of previous studies and recommendations for dam refurbishment

Dam Break studies

Emergency Preparedness Plan

Request Information